Driveway and Patio Permits in Kissimmee, St. Cloud and Osceola County
Kissimmee and unincorporated Osceola County both require a driveway permit before construction or widening, with the county capping residential driveways at 24 feet wide. St. Cloud exempts pavers on private property from a building permit but still requires Public Works approval for anything touching the right-of-way. As of October 2026, Celebration layers its own ARC review on top of the county permit.
By the Opera Concrete & Pavers estimating team · Updated October 1, 2026
Do You Need a Permit for a Driveway or Patio in Osceola County?
Yes in nearly every case, but which office you apply to depends on whether the address is inside Kissimmee, inside St. Cloud, or in unincorporated Osceola County. Kissimmee and unincorporated Osceola County both require a driveway permit before construction or widening, and St. Cloud requires Public Works approval for any work touching its right-of-way even though it exempts some paver work on private property from a building permit (City of Kissimmee; Osceola County Code §22-50.6; City of St. Cloud).
concrete driveways and paver patios & walkways cover the work itself; this post covers who signs off on it first.

City of Kissimmee: Driveway, Sidewalk and Slab Permits
Kissimmee's Engineering Division handles driveway and sidewalk work through its EnerGov portal under "Driveway / Sidewalk Construction," and staff tell applicants which documents they need once the application is open; routing takes at least 2 business days, and the city notes that some adjacent rights-of-way actually belong to FDOT or Osceola County rather than the city (City of Kissimmee). Right-of-way work is a separate permit with fees starting at a $25 minimum, $150 for an open cut on a paved street, $25 for an unpaved street, and $50 for bore-and-jack work (City of Kissimmee, Right-of-Way Permits). On the building side, the permit-type list includes "Slab With/Without Footer" for a patio or pad; pavers and retaining walls don't have their own listed category, so call Permitting at 407-518-2379 to confirm how a specific paver or wall job gets classified (City of Kissimmee, Types of Permits).
Unincorporated Osceola County: Driveway Width and Right-of-Way Rules
County code sets a hard limit on driveway width: "Residential driveways shall not exceed twenty-four (24) feet in width unless approved by conditional use," and any new driveway or widening needs a county driveway permit before work starts (Osceola County Code §22-50.6). The county's right-of-way permitting page is written mostly with utility work in mind, with disturbed areas required to be regraded within 48 hours and lane closures limited to set weekday windows, but it publishes no flat fee for a residential driveway permit, so confirm the current cost directly with the Building Office at 407-742-0200 (Osceola County Right-of-Way Permit Information). The county applies the 2026 HB 803 small-project exemption through its own "Owner Disclosure of Exempt Work" form rather than an automatic waiver (Osceola County Permit Information). Osceola's own homeowners page doesn't spell out patio, paver or retaining-wall permit rules beyond the driveway code above, so confirm those directly with the Building Office before scheduling work (Osceola County Homeowners).
City of St. Cloud: What's Exempt and What Isn't
St. Cloud's own "No Permit Required" list names "Pavers (Driveways/Sidewalks - Please see Public Works Department)" alongside resealing an existing on-site driveway, while its "Permit Required" list separately names a "Concrete Pad," a "Subdivision or Retaining Wall," and any swimming pool or spa work (City of St. Cloud, Permit Information). The exemption for pavers is conditional, not absolute: any work inside the public right-of-way still routes through Public Works and Engineering, with published right-of-way fees of a $110 base permit, $30 per curb cut, $100 per driveway inspection and $60 for sidewalk work (City of St. Cloud, Public Works Fees). A retaining wall needs a permit, though the city hasn't published a height threshold that triggers engineered drawings, so confirm that number directly with City Hall at 407-957-7300.
Celebration and Other Osceola Communities
Celebration and Poinciana sit inside unincorporated Osceola County for county-level driveway and paver permits, but a planned community can layer its own architectural review on top. Celebration's Architectural Review Committee meets on the third Monday of each month on a monthly application deadline; one cycle's posted example listed an April application due by early May at 5:30 p.m. (Celebration, Architectural Review Committee). The county permit covers the driveway or paver work itself; the community's own ARC review is a separate step that happens alongside it, and the exact submittal packet for Celebration's ARC wasn't published where this research could confirm it, so ask the community association directly before submitting.
| Jurisdiction | Driveway | Patio / pavers | Contact |
|---|---|---|---|
| City of Kissimmee | Engineering Division permit | Slab permit (patio); pavers not separately listed | 407-518-2278 |
| Unincorporated Osceola County | County driveway permit, 24 ft max width | Confirm with Building Office | 407-742-0200 |
| City of St. Cloud | ROW permit, $110 base + fees | Exempt on private property; ROW work still permitted | 407-957-7300 |
Fees and categories change; confirm current figures before you budget a project.
Does the Notice of Commencement Rule Apply Here Too?
It does, the same as anywhere else in Florida. Once a driveway, patio or paver contract passes $2,500, the owner records a Notice of Commencement before work starts, and once it passes $5,000 the permitting office needs a copy on file before the first inspection (F.S. 713.13; F.S. 713.135). Kissimmee, St. Cloud and Osceola County all print the standard statutory warning about paying twice on their permit applications.
A Quick Example
Say you have a 1,200 square foot driveway and walkway paver job in a 1990s Kissimmee subdivision near Lake Tohopekaliga. The driveway portion needs Kissimmee's Engineering Division permit, and if any part of it extends into the right-of-way strip near the street, that's a second permit with its own fee. The same job three miles away in unincorporated Osceola County instead goes through the county's driveway permit process, with the 24-foot width cap applying regardless of how wide the garage is behind it.
Related Reading
Frequently asked questions
Does St. Cloud really not require a permit for a paver driveway?
Pavers on private property are on the city's own no-permit list, but anything touching the public right-of-way, the apron, a curb cut or the sidewalk strip, still needs Public Works and Engineering approval with its own fee schedule (City of St. Cloud; St. Cloud Public Works Fees).
How wide can a residential driveway be in unincorporated Osceola County?
Code caps it at 24 feet unless the county approves a conditional use for something wider (Osceola County Code §22-50.6).
Does St. Cloud require a permit for a retaining wall?
Yes, though the city hasn't published a specific height that triggers engineered, signed-and-sealed drawings; confirm that threshold directly with City Hall before finalizing a wall design.
Where do I apply for a Kissimmee right-of-way permit?
Through the Engineering Division; fees start at a $25 minimum and scale up based on the type of work, with open cuts on paved streets running $150 (City of Kissimmee).
Does Celebration have its own approval process beyond the county permit?
Yes. Celebration's Architectural Review Committee reviews exterior changes separately from Osceola County's permit, meeting on the third Monday of each month on a monthly deadline (Celebration ARC); check with the community association for the current submittal packet.
Sources
- City of Kissimmee — Apply for Driveway/Sidewalk Construction
- City of Kissimmee — Apply for Right-of-Way Permits
- City of Kissimmee — Types of Permits
- Osceola County — Right-of-Way Permit Information
- Osceola County — Parking Ordinance, Ch. 22 Art. II (Sec. 22-50.6)
- Osceola County — Permit Information
- Osceola County — Homeowners
- City of St. Cloud — Permit Information
- City of St. Cloud — Public Works Fees
- Celebration, Architectural Review Committee
- F.S. 713.13 (2026) Notice of commencement
- F.S. 713.135 (2026) NOC and applicability of lien